![](/local/templates/delement/frontend/assets/images/card-video-bg.jpg)
Casing exit
Preview
“BURINTEKH”, Ltd renders casing exit services in all sizes from 102 to 245 mm using casing exit kits of own production Overhead tag the bottom, Overhead Hydro with a hydraulic pipe anchor, KF.
The design and performance of works are carried out by highly qualified specialists with many years of practical experience in milling windows.
At the designing stage we pay special attention to the next stage of the well construction cycle - drilling - by selecting the optimal diameters of the mills, we do not allow the risk of the BHA nonpassage through the milled window.
We have run and successfully applied technologies of double casing exit (140/168, 146/245, 168/245, 178/245 mm) and building multilateral wells.
To date more than 5,000 windows have been milled by “BURINTEKH”, Ltd specialists.
The positive dynamics of the volume of casing exit service support of previous years is a clear evidence of the quality and efficiency of the service.
Reviews
-
At the facilities of Gubkinsky subsidiary LLC RN-Drilling a range of services for construction of directional and horizontal wells is rendered. “BURINTEKH”, Ltd performs work on time and with good quality, uses advanced technologies, the company's equipment allows for trouble-free drilling of wells.
Publications
-
Analysis of vibration impact on self-unscrewing of the elements of Expandable Milling and reaming tools
-
Drilling dual lateral well at the Vostochno-Tarkosalinskoye field
-
Drilling Department: results of 2007
-
Vibration Loads and Reliability of reaming sidetrack
Related production:
Discuss the project
Our experts are always ready to advise you and answer your questions.