News

Records in drilling
02.02.2015 16:46:00

Over the 21.01.2015 to 24.01.2015 period on Salym Petroleum Development N.V. project on the pad No. 49 of Vadelypskoe field, well no. SVA-53005-K49-21 was achieved record rate in drilling production section: average ROP per run was 111m/h.

Back to News list