News

Records of Eastern Siberia
06.07.2012

On 29-30 of July on Talakan field with bit BIT 215.9 BT 716 YCM.382 the interval for production casing was drilled with record ROP rate - 39.2 m/h.

One more record rate was made with this bit the meterage for the first drilling day was 578 meters.

Back to News list