News

All 100 in Horizon
03.02.2012

By means of own manufactured equipment (core head BIT 142.9/80 B 913 YC.01 and core barrel KIS-127/80 non-isolated variant) Drilling department specialists successfully (core recovery was 100%) recovered core in well with horizontal ending on Eastern-Postolskoe field. (response of Technological department of Bashneft-Burenie, LLC)

Back to News list